VAXft Systems Model 810 Site Preparation Information

*HyperReader

  CONTENTS

  Title Page

  Copyright Page

  1      System and Site Planning Overview

  1.1     Model 810 System Overview

  1.2     System Building Blocks

  2      System Site Preparation

  2.1     Site Planning Guidelines
    2.1.1      Fire and Safety Codes
    2.1.2      Computer Security
    2.1.3      Data Protection

  2.2     Preparing for Delivery
    2.2.1      Facility Layout
    2.2.2      Space Requirements
    2.2.3      Airflow
    2.2.4      Raised Floor Environment

  2.3     Environmental Limits
    2.3.1      Temperature and Humidity
    2.3.2      Air Filtration
    2.3.3      Shock and Vibration

  3      Power and Safety Requirements

  3.1     Power Distribution and Requirements
    3.1.1      Power Distribution
    3.1.2      Electrical System
    3.1.3      AC Power Cables and Connectors
    3.1.4      Power Requirements

  3.2     Safety Requirements

  FIGURES

  1-1        Entry System Configuration

  1-2        Expanded System Configuration

  2-1        Model 810 Cabinet Space Requirements

  2-2        CPU Cabinet Airflow Pattern

  2-3        Psychrometric Chart

  3-1        Single Cabinet AC Power Distribution

  3-2        Dual Cabinet AC Power Distribution

  3-3        AC Power Distribution with Uninterruptible Power Supplies

  TABLES

  1-1        System Building Blocks

  2-1        Model 810 Cabinet Dimensions and Weights

  2-2        Temperature and Humidity Specifications

  2-3        Model 810 Shock and Vibration Specifications

  3-1        AC Power Connectors

  3-2        International Power Cables

  3-3        Entry System and Single Cabinet Package 120 Vac Power

  3-4        Entry System and Single Cabinet Package 240 Vac Power

  3-5        Dual Cabinet/Advantage Server 120 Vac Power

  3-6        Dual Cabinet/Advantage Server 240 Vac Power

  3-7        Dual Cabinet Package/Advantage Server 120 Vac Power

  3-8        Dual Cabinet Package/Advantage Server 240 Vac Power